Alemayehu Ketema General Contractor invites eligible bidders construction of the remaining works of approximately 96.95 km of road with Asphalt Concrete (AC) surfacing to a standard of DC6 for the main road and DC5 for the spurs
Alemayehu Ketema General Contractor
NOTICE OF INVITATION FOR RE-BID (3RD)
1. Alemayehu Ketema General Contractor, hereinafter called "the Main-Contractor," has entered into a contract agreement with the Ethiopian Roads Administration for the Construction Works of the Remaining Works of the Atat Mazoria-Gunchire - Kose-Geja - Lera Road Project.
2. The Main Contractor wants to re-invite competent and professional bidders to submit sealed bids for providing the necessary labor, material, and equipment for the Subcontract construction works of Dinkula Spur which is part of the above-referred road project.
3. The project road begins at Atat Mazoriya, 15km from the end of Wolkite Town the capital of Gurage Zone administration along Wolkite-Emdibir-Hosana road, and ends at Lera Town; a seat of the Mi'erab Azernet Berebere Wereda of Silte Zone and also a town on the same Wolkite-Hosana road. The works under this project consist of the construction of the remaining works of approximately 96.95 km of road with Asphalt Concrete (AC) surfacing to a standard of DC6 for the main road and DC5 for the spurs.
4. Bidding is open to all eligible bidders and the evaluation will be done as per qualification criteria specified and defined as shown below:
|
Item No. |
Qualification Criteria |
Requirement
|
|
1 |
Legal Status |
|
|
1.1 |
Certificate of Registration from Ministry of Urban Development and Construction renewed for 2016 EFY with category of GC-01 or RC-01 |
Must Meet |
|
1.2 |
Trade License Renewed for 2016 EFY |
|
|
1.3
|
Tax Clearance Certificate, which states that the bidder can participate in any public tender, valid till the bid submission date |
Must Meet |
|
1.4 |
VAT Registration Certificate and Tin No. Certificate |
Must Meet |
|
1.5 |
Registration as a Supplier in the list of the mandated public body, i.e. public Procurement and Property Administration Agency (PPPAA |
Must Meet |
|
2 |
History of Non-Performance |
|
|
|
Non-Performance History of Sub-Contractor/Bidder is not Accepted |
Must Meet |
|
3 |
Current Contract Commitments |
|
|
3.1 |
Sub-Contractor/Bidder shall have no contract with ERA or a contractor having any kind of projects with ERA within a maximum total amount of ETB 1 Billion |
Must Meet |
|
3.2 |
Sub-Contractor/Bidder shall not have a total sum of ETB 700 Million subcontract from the mandatory subcontracts |
Must Meet |
|
4 |
Peak Annual Construction Turnover |
|
|
4.1 |
Peak Annual Construction turnover for the last five years with ETB 72 Million |
Must Meet |
|
5 |
General Experience |
|
|
5.1 |
Experience on construction projects in the role of Contractor, Subcontractor, or Joint Venture Partner for at least the last Five (5) years |
Must Meet |
|
6 |
Specific Experience |
|
|
6.1 |
Experience on road construction projects in the role of Contractor, Subcontractor, or Joint Venture Partner for at least the last Two (2) years |
Must Meet |
5. The bidder has to:
5.1 Submit proof of evidence (contract agreement, Certified payment certificates, completion certificates. and the like...) for the general and specific experiences on projects that are completed as well as ongoing.
5.2. Present the listed below Equipment but not limited to those as required for the works to be sublated
|
Item No. |
Description |
Minimum Number |
|
1 |
Dozer |
2 |
|
2 |
Excavator |
4 |
|
3 |
Grader |
2 |
|
4 |
Roller |
3 |
|
5 |
Loader |
2 |
|
6 |
Water truck |
3 |
|
7 |
Dump Truck |
15 |
|
8 |
Concrete Mixer |
3 |
|
9 |
Vibrator |
2 |
5.3 Present the CVS and Testimonials documents of those professionals who are going to participate in the job.
5.4 Write a confirmation letter that the above machineries are at hand and ready for mobilization as of the instruction to commence the works to be submitted or as per work schedule.
5.5 Present detailed working methodology and Schedule as part of the technical document submission as specified in the technical specification.
6. Interested and eligible bidders may obtain the bill of quantity of the works on Dinkula spur from the address given below from 8:30 AM to 12:00 AM and 1:30 PM to 4:30 PM from Monday to Friday.
7. Bidders shall submit their Bids in two envelopes, the first envelope labeled as "Qualification Information" and the second envelope "Financial Bid", separately sealed and the two envelopes sealed in another outer envelope. One Original and Two Copies of the bids have to be submitted.
8. The bid must be accompanied by a bid security, in CPO addressed to Alemayehu Ketema General Contractor, of ETB 500,000.00.
9. The Qualification information and Bid Security will be opened immediately after the submission deadline in the presence of bidders' representatives who choose to attend, at the address below.
10. The Bid shall be submitted within 15 calendar days of the invitation to bid announcement date and to be submitted to 4:00 PM.
11. The bid must be delivered to the address specified below. One Original and Two Copies of the bids have to be submitted.
Alemayehu Ketema General Contractor
Bid Process and Project Evaluation Department.
Tel: +251 11 647 7795
Yere Ber, 200m to the Right of the road from Jacrosto Goro Junction
Leka Building, 5th Floor Room No. 501
Addis Ababa
12. Alemayehu Ketema General Contractor reserves the right to accept or reject any or all bids.
Alemayehu Ketema General Contractor