Procurement of Maintenance and Repair Service
Tender Information
| Title | Procurement of Maintenance and Repair Service |
| Description | የወፍጮ ቤት እና ሌሎች እቃዎች ጥገና ስራ ግዥ KIoT 2019 |
| Procuring Entity | Wollo University |
| Reference No | WU-NCB-NC-0013-2019-PUR |
| Procurement Method | Open |
| Submission Deadline | 2026-09-18 08:30:00 |
| Invitation Date | 2026-09-15 10:39:39 |
| Procurement Type | Shopping |
| Award Type | Lot based |
Contact Information
| Physical Address: | kedida, Room 422 kombolcha, Ethiopia |
| Contact Details: | Tel: +251 940361714 Email: telsa7032@gmail.com |
| Mailing Address: | P.O. Box 208, Postal Code: 208 |
No specific eligibility requirements provided.
Bid Security
Amount: 0 ETB
Terms and Conditions
ዩኒቨርሲቲው አማራጭ ካገኘ ጨረታውን ሙሉ በሙሉ ወይም በከፊል የመሰረዝ መብት አለው፡፡አሸናፊው ድርጅት የጥራት አረጋጋጭ ኮሚቴ ያሳለፈውን የዳቦ ማሽን ጥገና ስራ እና የዲናሞ ጥገና ስራን ኢንስቲትዩቱ ግቢ ድረስ በመምጣት መጠገን አለባቸው አለባቸው፡፡የጨረታ ተሳታፊ ድርጅቶቹ ለስራው ፍጥነት ሲባል ደሴ; ኮምቦልቻ እና አካባቢው ቢሆን ይመረጣል፡፡ አሸናፊው ድርጅት ያሸነፈውን የጥገና ስራ ኮምቦልቻ ቴክኖሎጂ ኢንስቲትዩት ግቢ ድረስ በመምጣት የጥገና ስራውን የማይሰራ ከሆነ በግዥ መመሪያው መሠረት የጥፋተኝነት ሪፖርት በመሙላት ለግዥና ንብረት ባለስልጣን በመላክ አስፈላጊው እርምጃ የምናስወስድ መሆኑን እንገልጻን፡፡የሚሰራው ዝርዝር ስራ ከዚህ በታች በተዘረዘረው መሰረት ሲሆን ለጥገና ስራው የሚያስፈልጉ ሙሉ እቃዎችን አሸናፊው ድርጅት በራሱ ያቀርባል፡፡
1ኛ.የዳቦ ማሽን ጥገና-------ብዛት 2/ሁለት/
All service maintenance 18 tray Rotary brad baking oven with all needed device change for your company
All bidders first check the machine where it is and runs the equipment needed for maintenance.
1. Check for pitch line separation of gear and pinion.
Check for pitch line run-out of gear and pinion.
Check condition of welds on gear flange and mounting lugs.
Check for excessive ring and roller wear.
Lubricate the drive coupling.
Semi-annual maintenance tasks
Change gear lube and clean sump and gear area if needed.
Change grease on pinion shaft and support roller bearings.
Change grease in thrust roller bearings.
Inspect shell for cracks under rings.
Check radial alignment of gear and pinion.
Inspect drive coupling grid members
2. Check the alignment of the unit.
3. Adjust the rollers to a neutral position to re-train the unit.
4. Weld repair cracks in shell, wedges, filler bars or support bands.
5. Clean and inspect gear.
Check gear teeth for abnormal wear.
Change gear lubrication.
Check drive train couplings for wear and replace if needed.
Check and repair welds on gear flange or mounting lugs and gear if needed.
Check for loose nuts or bolts on gear mounting flange.
Inspect, clean repack and change lubrication on pinion bearings.
Check brush rigging and electrical components of drive motor.
Take samples of gear box oil and send to a laboratory to detect oil contamination.
6. Clean and inspect support roller bearings.
7. Clean and grease the support roller adjustment screws and wrap them in burlap
ማሽኑን ባለበት አይቶ ለጥገና የሚያስፈልጉትን እቃዎች ከራሱ ችሎ የሚስራ
1.ዲናሞ ጥገና 18KW Motor Rewinding------ብዛት 1/አንድ/
ማሳሰቢያ:-ለጥገና ስራው የሚያስፈልገውን ሙሉ እቃዎች/ለዳቦ ማሽኑ እና ለድናሞው/ አሸናፊው ድርጅት በራሱ አቅርቦ መጠገን አለበት፡፡
1ኛ.የዳቦ ማሽን ጥገና-------ብዛት 2/ሁለት/
All service maintenance 18 tray Rotary brad baking oven with all needed device change for your company
All bidders first check the machine where it is and runs the equipment needed for maintenance.
1. Check for pitch line separation of gear and pinion.
Check for pitch line run-out of gear and pinion.
Check condition of welds on gear flange and mounting lugs.
Check for excessive ring and roller wear.
Lubricate the drive coupling.
Semi-annual maintenance tasks
Change gear lube and clean sump and gear area if needed.
Change grease on pinion shaft and support roller bearings.
Change grease in thrust roller bearings.
Inspect shell for cracks under rings.
Check radial alignment of gear and pinion.
Inspect drive coupling grid members
2. Check the alignment of the unit.
3. Adjust the rollers to a neutral position to re-train the unit.
4. Weld repair cracks in shell, wedges, filler bars or support bands.
5. Clean and inspect gear.
Check gear teeth for abnormal wear.
Change gear lubrication.
Check drive train couplings for wear and replace if needed.
Check and repair welds on gear flange or mounting lugs and gear if needed.
Check for loose nuts or bolts on gear mounting flange.
Inspect, clean repack and change lubrication on pinion bearings.
Check brush rigging and electrical components of drive motor.
Take samples of gear box oil and send to a laboratory to detect oil contamination.
6. Clean and inspect support roller bearings.
7. Clean and grease the support roller adjustment screws and wrap them in burlap
ማሽኑን ባለበት አይቶ ለጥገና የሚያስፈልጉትን እቃዎች ከራሱ ችሎ የሚስራ
1.ዲናሞ ጥገና 18KW Motor Rewinding------ብዛት 1/አንድ/
ማሳሰቢያ:-ለጥገና ስራው የሚያስፈልገውን ሙሉ እቃዎች/ለዳቦ ማሽኑ እና ለድናሞው/ አሸናፊው ድርጅት በራሱ አቅርቦ መጠገን አለበት፡፡
