Action for Development (AFD), a local organization, invites interested bidders to Supply of fitting for HDPE & G.I Pipes for its project entitled “Climate Resilient Wash Project in South Ari , Ethiopia”, and “Integrated WASH Project” being implemented in partnership with NCA.
Action For Development(AFD)
Invitation to Bid
Bid Reference No: AFDAO-36/2026
- Action for Development (AFD), a local organization, invites interested bidders to Supply of fitting for HDPE & G.I Pipes for its project entitled “Climate Resilient Wash Project in South Ari , Ethiopia”, and “Integrated WASH Project” being implemented in partnership with NCA.
- Financed by: NCA
- Types and quantities of the fittings for HDPE & G.I Pipes to be supplied:
| Lot 1 | Description | Unit | Quantity |
| 1 | staff flange adaptor with back ring, DN40, PN20 | Pcs | 7 |
| 2 | Flange DN40, PN20 with nut, bolt & washer | Pcs | 7 |
| 3 | Gasket DN40, PN16 | Pcs | 7 |
| 4 | staff flange adaptor with back ring, DN65, PN20 | Pcs | 1 |
| 5 | Flange DN65, PN20 with nut, bolt & washer | Pcs | 1 |
| 6 | Gasket DN65, PN16 | Pcs | 1 |
| 7 | GI reducer 2”-1/2” | Pcs | 3 |
| 8 | G.I. Elbow 11/2″ | Pcs | 20 |
| 9 | G.I. Elbow 21/2″ | Pcs | 4 |
| 10 | G.I. Elbow 2″ | Pcs | 10 |
| 11 | G.I. Tee 2″ | Pcs | 2 |
| 12 | G.I. Nipples, 2″ | Pcs | 4 |
| 13 | G.I. Nipples, 11/2″ | Pcs | 14 |
| 14 | G.I. Gate valve 21/2″ | Pcs | 2 |
| 15 | G.I. Gate valve 11/2″ | Pcs | 1 |
| 16 | G.I. Nipples, 21/2″ | Pcs | 4 |
| 17 | G.I. union 21/2″ | Pcs | 4 |
| 18 | G.I. Gate valve 2″ | Pcs | 2 |
| 19 | GI Tap 2” | Pcs | 2 |
| 20 | HDPE female adaptor 75mm, PN16, | Pcs | 2 |
| 21 | HDPE female adaptor 50mm, PN16 | Pcs | 13 |
| 22 | HDPE female adaptor 32mm, PN16, | Pcs | 16 |
| 23 | Male Adapter 32mm, PN 16 | Pcs | 2 |
| 24 | HDPE compression Tee, PN16, (75x32x75mm) | Pcs | 2 |
| 25 | HDPE compression Tee, PN16, (75x75x75mm) | Pcs | 1 |
| 26 | HDPE compression Tee, PN16, (50x32x50mm) | Pcs | 3 |
| 27 | HDPE compression Tee, PN16, (63x32x63mm) | Pcs | 5 |
| 28 | HDPE reducer, 63mm to 32mm, PN16 | Pcs | 2 |
| 29 | HDPE Tee, PN16, (75x32x75mm) | Pcs | 1 |
| 30 | HDPE reducer, 75mm to 63mm, PN16 | Pcs | 5 |
| 31 | HDPE reducer, 63mm to 50mm, PN16 | Pcs | 2 |
| 32 | HDPE reducer, 50mm to 32mm, PN16 | Pcs | 3 |
| 33 | HDPE Saddle clamp(63 to 50mm) | Pcs | 2 |
| 34 | HDPE Saddle clamp(50 to 32mm) | Pcs | 2 |
| 35 | G.I. Gate valve 1″ | Pcs | 18 |
| 36 | G.I. Union 1″ | Pcs | 21 |
| 37 | G.I. Nipples 1″ | Pcs | 32 |
| 38 | G.I. elbow 1″ | Pcs | 16 |
| 39 | G.I. Tee 1″ | Pcs | 42 |
| 40 | G.I. cross Tee 1″ | Pcs | 16 |
| 41 | G.I. coupling 1″ | Pcs | 105 |
| 42 | G.I. reducer (1″ to 3/4″) | Pcs | 116 |
| 43 | G.I. faucet 3/4″ | Pcs | 116 |
| 44 | GI Water meter 1” | Pcs | 16 |
| 45 | HDPE coupling 75mm, PN16 | Pcs | 7 |
| 46 | HDPE coupling 63mm, PN16 | Pcs | 21 |
| 47 | HDPE coupling 50mm, PN16 | Pcs | 27 |
| 48 | HDPE coupling 32mm, PN16 | Pcs | 35 |
- Bidders should bid for all items in the Lot. Partial offer within the lot will lead to automatic rejection.
- Eligible bidders invited to take part in the bid are expected to submit copies of renewed trade license , Vat and Tax Payer’s Identification certificates.
- Bidding will be conducted through local Open Bid procedure.
- The bid document can be purchased from Action for Development (AFD) against payment of non-refundable fee of Birr 300.00 during office hours, as of the date of this notice.
- Interested bidders may obtain further information from Administration and Finance Department of Action For Development, Tel 011 662 59 76 / 0939655371, Fax 011 662 55 63
- All bids must be accompanied by a bid bond amounting to 1% of the total bid amount including 15% VAT, in the form of C.P.O. Or Unconditional Bank Guarantee. Bid bond in any other form shall not be acceptable.
- All bids must be submitted by stating the contract title – Supply of fittings for HDPE & G.I Pipes Bid Ref. No –AFDAO-36/2026 with sealed envelope at or before 2:00 P.M on 18 June , 2026. The technical and financial offer must be placed together in a sealed envelope.
- Bids will be opened in the presence of bidders and/or their official representatives who wish to attend on 18, June , 2026 at 2:30 P.M.
- Failure to comply with any of the conditions indicated above will result in automatic rejection.
- The Organization reserves the right to accept or reject any or all bids.
Action For Development
