Corrective and preventive Maintenance for Data center Power Facility
BONGA UNIVERSITY
Tender Information
| Title | Corrective and preventive Maintenance for Data center Power Facility |
| Description | Procurement of ICT Equipment |
| Procuring Entity | BONGA UNIVERSITY |
| Reference No | BU-NCB-W-0001-2019-BID-Open |
| Procurement Method | Open |
| Submission Deadline | 2026-08-24 10:00:00 |
| Invitation Date | 2026-08-04 00:00:00 |
| Procurement Type | Bidding |
| Award Type | two envelop |
Contact Information
| Physical Address: | bonga, Room AD-08 Bonga, Ethiopia |
| Contact Details: | Tel: +251 474524588 Email: bongau.edu.et@gmail.com |
| Mailing Address: | P.O. Box 334, Postal Code: 334 |
LegalQualification
- •valid business license : Bidder has to submit valid business license indicating the stream of business in which the Bidder is engaged, in accordance with ITB Clause 4.5(b)(i); (Ref: ITB 37.2)
- •valid tax clearance certificate : Bidder has to submit a valid tax clearance certificate issued by the tax authority in accordance with ITB Clause 4.5(b)(iii). (Ref: 37.2(h))
- •VAT registration certificate: Bidder has to submit VAT registration certificate issued by the tax authority (in case of contract value specified in BDS Clause 4.5(b)(ii)), in accordance with ITB Clause 4. 5(b)(ii).; (Ref: ITB 37.2(g))
- •Debarment: Bidder has not been debarred by a decision of the Public Procurement and Property Administration Authority from participating in public procurements for breach of its obligation under previous contracts, in accordance with ITB Clause 4.3; (Ref: ITB 37.2(e))
- •Nationality: Bidder does have nationality in accordance with ITB Clause 4.2. (Ref: ITB 37.2(a))
- •conflict of interest: Bidder is found to have a conflict of interest as described in ITB Clause 6; (Ref: ITB 36.2(b))
- •Business organization Registration certificate: Bidder has to submit business organization registration certificate in accordance with ITB Clause 4.5(c). (Ref: ITB 37.2(f))
FinancialQualification
- •Financial Resources:
The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means of 10,000,000, other than any contractual advance payments to meet the cash-flow requirement.
(Ref: ITB 37.5 (a)) - •Annual Turnover:
The Peak annual turnover of 1,500,000 calculated as total certified construction work payments received for contracts in progress or completed within the past Five years
(Ref: ITB37.5(d)) - •Historical Financial Performance:
As a proof of the bidder's financial standing the following documents need to be furnished:
· A complete Audited financial statement for the past five years prepared by external certified Auditor.
· Letter from Ministry of Revenue stating the annual turnover of the
bidder from similar works only for the past five years
(Ref: ITB 37.5 (b))
ProfessionalQualification
- •CVs of the Professional staffs: Bidder has failed to provide CVs of the Professional staff signed by the staff themselves or by the authorized representative of the Professional Staff. (Ref: ITB 37.3)
- •Project Manager:
MSC in communication engineering, electrical engineering/related fields, PMP certified with minimum of 4 years’ experience
(Ref: itb 37.3) - •Security Lead:
minimum Bsc in Electrical Engineering/Computer Science or related fields with at list 5 years of experience. Minimum Certifications CISSP, CEH, Certified in ITIL
(Ref: ITB 37.3) - •Datacenter Design professional :
at least 1 Certified Datacenter Design professional (CDCDP) and 1 in electrical or power related certificate
(Ref: ITB 37.3) - •Electrical Engineer/Computer Enginner:
minimum Bsc in Electrical Engineering/Computer Science or related fields with experience in installation/configuration, designing and deploying Enterprise Networks, UPS, Battery and CCTv
(Ref: ITB 37.3)
TechnicalQualification
- •Bidder Certification of Compliance Form:
Bidder shall provide at least Two Certificates of satisfactory execution of contracts provided by contracting parties to the contracts successfully completed in the course of the past Ten years with a budget of at least 50 million ETB.
(Ref: ITB 37.4(c)) - •General experience:
Number of similar projects in Ethiopia (3 projects as minimum)
(in the last Three years):
(Ref: ITB 37.4) - •Specific Experiance: Minimum of 2 project certificate/letter or contract or progress or successful on electromechanical and related infrastructure projects. (Ref: ITB 37.4(b))
- •Tender Specific Manufacturer Authorization Form (MAF).MAF and collaboration shall be subjected to confirmation by the manufacture for each selected Hardware devices:
Tender Specific Manufacturer Authorization Form (MAF).MAF and collaboration shall be subjected to confirmation by the manufacture for each selected Hardware devices
(Ref: ITB 4.5) - •Support (2 years):
Support (2 years)
(Ref: ITB 4.5) - •Integration and Interoperability with existing Datacenter UPS Solution:
Integration and Interoperability with existing Datacenter UPS Solution
(Ref: ITB 4.5) - •Site survey report (should be attached in the technical document):
Site survey report (should be attached in the technical document)
(Ref: ITB 4.5) - •Data Sheets:
Data Sheets
(Ref: ITB 4.5) - •Compliancy Table:
Compliancy Table
(Ref: ITB 4.5) - •BoQ without Price in your technical Document:
BoQ without Price in your technical Document
(Ref: ITB. 4.5) - •Product Quality certificates specified in the term of reference which is certified through known certification Organization shall be supplied.:
Product Quality certificates specified in the term of reference which is certified through known certification Organization shall be supplied.
(Ref: ITB 4.5) - •Implementation Plan and Delivery Schedule: • Team structure and Responsibility matrix • Delivery schedule, Scheduling of implementation/deployment of activities and Clarity of time frame (Maximum of 4 month ) :
Implementation Plan and Delivery Schedule:
· Team structure and Responsibility matrix
Delivery schedule, Scheduling of implementation/deployment of activities and Clarity of time frame (Maximum of 4 month )
(Ref: ITB 4.5) - •Over all compliance to the technical requirements: -Technical write-up and Solution's Compliancy with BoQ (Falling to do so will result in rejection from the bid) • Clear understanding of the problem:
Over all compliance to the technical requirements: -Technical write-up and Solution's Compliancy with BoQ (Falling to do so will result in rejection from the bid)
Clear understanding of the problem
(Ref: ITB 4.5)
Bid Security
Amount: 200000 ETB
SME Bid Security Form: CPO, Bank_Guarantee
Foreign Bidders Form: CPO, Bank_Guarantee
Local Bidders Form: CPO, Bank_Guarantee
Terms and Conditions
Bidders must physically submit a bid bond (CPO) to Bonga University prior to the opening of the bid.
General information regarding the tender and the detailed tender specifications are outlined in the design document.
