Procurement of Building Renovation and Maintenance Work
ministry of Health
Tender Information
| Title | Procurement of Building Renovation and Maintenance Work |
| Description | Procurement of Building Renovation and Maintenance Work |
| Procuring Entity | Ministry of Health |
| Reference No | MoH-NCB-W-0020-2019-BID-Open |
| Procurement Method | Open |
| Submission Deadline | 2026-12-25 14:00:00 |
| Invitation Date | 2026-11-26 00:00:00 |
| Procurement Type | Bidding |
| Award Type | two envelop |
Contact Information
| Physical Address: | Sudan, Room Ministry of Health Addis Ababa, Ethiopia |
| Contact Details: | Tel: +251 980035667 Email: mogesgebru64@gmail.com |
| Mailing Address: | P.O. Box 1234, Postal Code: 1234 |
FinancialQualification
- •Financial Resources:
The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet the following cash-flow requirement as ETB 65 million of the Bidder’s other commitments
(Ref: 17.2) - •Historical Financial Performance:
Submission of audited balance sheets and other financial statements as required in the BDS Clause 17, for the last 5 years to demonstrate the current soundness of the Bidder's financial position and its prospective long term profitability as the liquidity ration of current asset to current liability is ≥ 1.00
(Ref: 17.2) - •Annual Turnover:
The minimum Peak Construction annual turnover is ETB 160 million calculated as total certified payments received for contracts in progress and/or completed within the last 5 (Five) years.
(Ref: 17.2)
TechnicalQualification
- •General experience:
A minimum of Five (5) years General Experience in the field of Construction
(Ref: 15.2) - •Pending litigation:
All pending litigation shall in total not represent more than 10% of the Bidder’s net worth and shall be treated as resolved against the Bidder.
(Ref: 15.2) - •Equipment for the implementation of the contract:
Equipment Type and Characteristics---------------Scaffolding and Formwork (Standard steel or treated timber)
Minimum Requirement---------------------------------Steel H Frame
Minimum Number Required---------------------- ≥1700m2
Age*----------------------------------- ≤ 5 Years
(Ref: 15.1) - •Equipment for the implementation of the contract:
Equipment Type and Characteristics---------------Surveying Equipment
Minimum Requirement---------------------------------(Total Station & Automatic Level)
Minimum Number Required---------------------- 1 set
Age*----------------------------------- ≤ 3 Years
(Ref: 15.1) - •Equipment for the implementation of the contract:
Equipment Type and Characteristics---------------Excavator
Minimum Requirement-------------------------------a capacity of ≥ 1.5m3
Minimum Number Required---------------------- 1
Age*----------------------------------- ≤ 15 Years
(Ref: 15.1) - • History of non-performing contracts:
Non-performance of a contract did not occur within the last Five (5) years prior to the deadline for Bid submission, based on all information on fully settled disputes or litigation. A fully settled dispute or litigation is one that has been resolved in accordance with the Dispute Resolution Mechanism under the respective contract, and where all appeal instances available to the bidder have been exhausted.
(Ref: 15.2) - •Equipment for the implementation of the contract:
Equipment Type and Characteristics---------------Dump truck
Minimum Requirement-------------------------------132 Quintal and Above
Minimum Number Required---------------------- 2
Age*----------------------------------- ≤ 15 Years
(Ref: 15.1) - •Equipment for the implementation of the contract:
Equipment Type and Characteristics---------------Concrete mixer
Minimum Requirement-------------------------------750 lit
Minimum Number Required---------------------- 3
Age*----------------------------------- ≤ 10 Years
(Ref: 15.1) - •Equipment for the implementation of the contract:
Equipment Type and Characteristics---------------Concrete vibrator
Minimum Number Required---------------------- 4
Age*----------------------------------- ≤ 5 Years
(Ref: 15.1) - •Equipment for the implementation of the contract:
Equipment Type and Characteristics---------------Generator
Minimum Requirement------------------------------- 200 KVA
Minimum Number Required---------------------- 1
Age*----------------------------------- ≤ 10 Years
(Ref: 15.1) - •Equipment for the implementation of the contract:
Equipment Type and Characteristics--------------Hand Compactor
Minimum Requirement------------------------------- 2 tones
Minimum Number Required---------------------- 3
Age*----------------------------------- ≤ 5 Years
(Ref: 15.1) - •Equipment for the implementation of the contract:
Equipment Type and Characteristics-------------Gong Lifts / Material Hoists
Minimum Requirement-------------------------------Min. 2 tone lifting capacity
Minimum Number Required---------------------- 1
Age*----------------------------------- ≤ 5 Years
(Ref: 15.1) - •3.5. Equipment for the implementation of the contract:
Equipment Type and Characteristics-------------Pick-up Truck (4WD for site logistics
Minimum Requirement------------------------------- 1 tone
Minimum Number Required---------------------- 1
Age*----------------------------------- ≤ 10Years
(Ref: 15.1) - •Specific experience:
The Bidder shall demonstrate experience within the ten years before the bid submission deadline in comparable health-facility construction or renovation original contract value for one ETB 190,000,000.00(One Hundred Ninety Million Birr) of one construction project or three contracts minimum of ETB 63,500,000.00 million for each similar in nature to the proposed works such as construction of at least G+1 health facility. The contractor must have completed at least 70% of the work in a satisfactory and acceptable manner, either as a sole contractor, joint venture member, or subcontractor. or if the contractor may not meet the relevant work experience requirement by having completed one similar project experience across three completed projects of similar nature may be submitted, provided the cumulative value is not less than one-third of the required threshold.
In cases where relevant work experience is based on subcontracting or joint ventures, only the portion executed directly by the contractor or corresponding to its share in the joint venture shall be considered.
7. For the purposes of tender evaluation, adjustments to project values submitted by contractors as part of their work experience shall be made using the foreign exchange rate prevailing 28 days prior to the tender closing date. The adjustment shall involve dividing the contractual value at the time of agreement by the foreign exchange rate applicable at that time and then multiplying by the prevailing rate. The foreign currency exchange rate published by the National Bank of Ethiopia shall serve as the reference.
For the implementation of this Article:
a) “Substantially Completed” means a project in which at least 70% (for domestic contractors)
b) “Satisfactorily Completed” means a project in which at least 70% of the works have been executed by the contractor within the agreed schedule, including any approved extensions, and where a certificate of satisfactory completion, payment certificate, or other verifiable documentation from the client confirms that the required quality standards have been achieved
(Ref: 15.2)
LegalQualification
- •Conflict of Interest:
No conflict of interest as described in ITB Clause 6.
(Ref: 6) - •Nationality:
Nationality in accordance with ITB Clause 4.2.
(Ref: 4.2)
ProfessionalQualification
- •umber of staff:
The Bidder must have at least Ten (10) staff currently employed. To verify this, the Bidder shall submit the following supporting documents:
• Payroll records for the latest three (3) months, and
• Income tax receipts issued by the relevant tax authority for the same period, covering all staff members, including those proposed for key positions.These documents must clearly demonstrate that the aforementioned ten (10) staff are actively employed by the Bidder.
(Ref: 15.1) - •Project Manager (1):
Relevant academic qualifications-------------M.Sc./B.Sc. in Civil Engineering or related field -
Minimum years of relevant work experience----------6/8
(Ref: 15.1) - •Site Engineer (1):
Relevant academic qualifications-------------M.Sc./B.Sc. in Civil Engineering or related field -
Minimum years of relevant work experience----------4/6
(Ref: 15.1) - •Electrical Engineer (1):
Relevant academic qualifications-------------M.Sc./B.Sc. in Electrical Engineering
Minimum years of relevant work experience----------4/6
(Ref: 15.1) - •Sanitary Engineer (1):
Relevant academic qualifications-------------M.Sc./B.Sc. in Water supply or Sanitary Engineering
Minimum years of relevant work experience----------4/6
(Ref: 15.1) - •Surveyor (1):
Relevant academic qualifications------------ Technical School Diploma in Surveying
Minimum years of relevant work experience----------6
(Ref: 15) - •Office Engineer (1):
Relevant academic qualifications------------M.Sc./B.Sc. in Civil Engineering- or related field
Minimum years of relevant work experience----------4/6
(Ref: 15.1) - •General Forman (1):
Relevant academic qualifications------------ Technical School diploma in building construction -
Minimum years of relevant work experience----------8
(Ref: 15.1) - •Health & Safety Officer (1):
Relevant academic qualifications------------ BSc. In Environmental engineering or related fields with Certificate/Diploma in Occupational Health & Safety or related
Minimum years of relevant work experience----------6
(Ref: 15.1)
Bid Security
Amount: 1500000 ETB
SME Bid Security Form: Letter_from_Small_and_Micro_Enterprise
Foreign Bidders Form: Bank_Guarantee
Local Bidders Form: Bank_Guarantee