Construction of Logistics Base in Gambella
Tender Documents:
Annex C- Technical Evaluation Criteria.pdf
Price: Free
Annex D- Site Layout for Logbase and Pilot Fuel Tank.pdf
Price: Free
Annex E-Drawing-Watch Tower.pdf
Price: Free
Annex F-Drawing-Generator Room.pdf
Price: Free
Annex G-Drawing-Guard Room.pdf
Price: Free
Annex H-Drawing-Old Rub hall Platform 10mx 24m.pdf
Price: Free
Annex I-Drawing-Pit Latrine.pdf
Price: Free
Annex J - Vendor Registration Form.pdf
Price: Free
Annex K- UNHCR General Conditions of Contracts for the Provision of Goods and Services 2018.pdf
Price: Free
Annex L- UNHCR Supplier Code of Conduct.pdf
Price: Free
Annex M - Geneal Conditions of Contract for Civil Works.pdf
Price: Free
Issuing organisation: UNHCR
Notice type: Request for proposal
UNHCR Gambella plans to construct a dedicated logistics base within the vicinity of its office compound, located in Kebele 04, on a 14,000-square-meter plot of land generously allocated by the local government to support UNHCR's operational requirements. Although the land was secured with the intention of establishing a permanent logistics facility, the project could not be realized due to funding constraints and a temporary suspension of construction activities imposed by regional bureau in 2024. Currently, UNHCR operates from a rented warehouse facility that offers limited capacity and no possibility for future expansion to accommodate growing operational needs. As the scale and complexity of humanitarian operations continue to increase, the limitations of the existing facility have become a significant operational challenge. The proposed Logistics Base will serve as a central hub for logistics and fleet management activities in Gambella. The facility is planned to include rub halls for CRIs storage, a fuel station, office buildings, and a workshop as its primary structures. In addition, the project will incorporate essential support infrastructure, including security installations, WASH facilities, a staff canteen, a vehicle washing bay, parking areas, and other operational support facilities. The logistics base will be managed by a national partner under UNHCR's oversight. The facility will be operated in accordance with UNHCR's inventory and asset management procedures and will comply with the organization's minimum operational and security standards, ensuring accountability, efficiency, and the safeguarding of humanitarian assets. This investment will provide a sustainable and cost-effective long-term solution for UNHCR's logistics operations in Gambella, enhancing supply chain efficiency, strengthening fleet management capacity, and supporting the effective delivery of humanitarian assistance.
Tender documents: available on UNGM. View this notice on UNGM (a free UNGM supplier registration is required to download documents).
