Tender Detail

Tender Details

  • Company Construction Management Institute
  • Address , Phone: +251115575638
  • Website
  • Deadline10 Dec 2025, 5:36 PM
  • magazineEGP
  • CountryEthiopia
  • Official noticeproduction.egp.gov.et
  • Bid Document PriceNot stated in the notice
  • Bid SecurityNot stated in the notice
  • opening dateNot stated in the notice
  • Categories Goods

Lot 72 Procurement of Advertising /የታፔላ ግዥ/

Construction Management Institute


Tender Information

TitleLot 72 Procurement of Advertising /የታፔላ ግዥ/
DescriptionLot 72 Procurement of Advertising /የታፔላ ግዥ/
Procuring EntityConstruction Management Institute
Reference NoCMI-NCB-G-0040-2018-PUR
Procurement MethodOpen
Submission Deadline2025-12-10 17:36:43
Invitation Date2025-12-09 17:36:43
Procurement TypeShopping
Award TypeItem based

Contact Information

Physical Address:Kality Sub city Sheger Dabo Bakery Ethiopian Road Administration, Room 3rd Floor Room No 3D21
A.A, Ethiopia
Contact Details:Tel: +251 115575638
Email: cpmi@cmi.gov.et
Mailing Address:P.O. Box 23650, Postal Code: 23650/1000

Eligibility Requirements

  • •Valid Trade License: trade license
  • •Valid Tax Clearance Certificate: tax Clearance

Bid Security

Amount: 0 ETB

Terms and Conditions

*ታፔላዉ የሚሰራዉ ሰንዳፋ ከተማ እስከ ታህሳስ 8/2018 ዓ.ም ድረስ ግዴታ ተዘጋጅቶ መቅረብ አለበት፡፡ 1. Physical Specifications These ensure the board is durable, visible, and safe for the duration of the project. • Dimensions: o Standard Regulatory Board: 1.5 m×2m. o Height from Ground: The bottom edge should be at least 1m below ground that filled with concrete after pit excavation and above ground level 3m for visibility. • Material: o Weather-resistant CHS (min 0.6 mm), Aluminum Composite Panel (ACP), • Printing: o UV-resistant digital printing or high-quality vinyl lettering. o Matte finish is preferred to prevent glare from headlights or sunlight. 2. Content Requirements Information must be legible for the public printed on both sides A. Project Identity • Project Title: • Project Description: • Site Location: • Client / Developer: • Main Contractor: • Lead Consultant / Architect: B. Timeline • Commencement Date: within 3 days from bid submission. • Scheduled Completion: within 10 days from bid submission. c. Typography & Design • Font: Use clean, • Text Size: o Project Title: Min height 100 mm. o Body Text: Min height 50 mm. • Contrast: High contrast (e.g., Black/Dark Blue text on White background) is standard. All will be approved by Engineer
Save Tender