Procurement of Construction maintenance work for EPSS Saris Abo warehouse
Ethiopia Pharmaceutical Supplies Service
Tender Information
| Title | Procurement of Construction maintenance work for EPSS Saris Abo warehouse |
| Description | Procurement of Construction maintenance work for EPSS Saris Abo warehouse |
| Procuring Entity | Ethiopia Pharmaceutical Supplies Service |
| Reference No | EPSA-NCB-W-0102-2017-BID-Open |
| Procurement Method | Open |
| Submission Deadline | 2025-07-15 15:00:00 |
| Invitation Date | 2025-06-17 09:45:46 |
| Procurement Type | Bidding |
| Award Type | single envelop |
Contact Information
| Physical Address: | around paster infront of st.powelos hospital, Room General Service Office ADDIS ABABA, Ethiopia |
| Contact Details: | Tel: +251 953152597 Email: bruksent@gmail.com |
| Mailing Address: | P.O. Box 21094, Postal Code: 00 |
ProfessionalQualification
- •Number of staff: At least staff currently work for the Bidder. (Ref: 37.3 (b))
- •Personnel for the key positions: Among the staff mentioned in Sub-Clause 2.1 Bidder must demonstrate that it will have the personnel for the key positions that meet the following requirements; (Ref: 37.3(c))
- •Professional Qualification Criterion:
Project Manager
MSc/BSc. in Civil Engineering or related field with renewed professional license for the year 2015 EC experiance 4/6
(Ref: ITB 4) - •Professional Qualification Criterion:
Office Engineer M.Sc./B.Sc. in Civil Engineering- or related field 4/6 years of relevant work experience
(Ref: ITB 4) - •Professional Qualification Criterion:
Construction Forman
Technical School diploma in building construction with renewed professional license for the year 2015 EC - EA IV
experience 7 year
(Ref: ITB 4) - •Professional Qualification Criterion:
safety Officer CV in Diploma or Bachelor's Degree in:
Occupational Health and Safety (OHS)Environmental HealthPublic HealthCivil Engineering or Construction Management (with OHS certification)Minimum of 1 years of experience in construction projects as a Safety Officer or HSE (Health, Safety, Environment) officer.
(Ref: ITB 4) - • Professional Qualification Criterion:
Construction Engineer cv
B.Sc. in Civil Engineering- or related field with renewed professional license for the year 2015 EC PE IV
experiance 2 years
(Ref: ITB 4) - •Technical qualification criteria:
Contractor’s registration certificate from Ministry of Urban Development GC-5
(Ref: 4.6)
LegalQualification
- •Form Data on Joint Ventures:
In the case of a bid submitted by a joint venture (JV), the Bidder has to submit the Form Data on Joint Ventures, the Agreement governing the formation of the joint venture, or letter of intent to form JV, including a draft agreement, in accordance with ITB Clause 4.1
(Ref: 4.1) - •Valid tax clearance certificate: Having been submitted valid tax clearance certificate issued by the tax authority (Domestic Bidders Only) in accordance with ITB Clause 4.6 (Ref: 37.2(h))
- •VAT registration certificate:
Having been submitted VAT registration certificate issued by the tax authority (in case of contract value of Birr 200,000.00 and above) in accordance with ITB Clause 4.6.
(Ref: 27.2(g)) - •Conflict of Interest: No conflict of interest as described in ITB Clause 6. (Ref: 37.2(b))
- •Nationality : Nationality in accordance with ITB Clause 4.2. (Ref: 37.2(a))
- •Valid trade license or business organization registration certificate: Having been submitted valid trade license or business organization registration certificate issued by the country of establishment in accordance with ITB Clause 4.6. (Ref: 37.2(c))
- •Debarred by decision of the FPPA: Not having been debarred by decision of the Public Procurement Agency from participating in public procurements for breach of its obligation under previous contracts in accordance with ITB Clause 4.3. (Ref: 37.2(e))
- •Government Owned Entity: Compliance with conditions of ITB Clause 4.4. (Ref: 4.4)
FinancialQualification
- •Financial Resources: The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet the following cash-flow requirement: (Ref: 37.5 (e))
- •Average Annual Turnover:
The average annual turnover calculated as total certified payments received for contracts in progress or completed within the last years must exceed times the amount of the financial proposal of the Bid.
The average annual turnover calculated as total certified payments received for contracts in progress or completed within the last years must exceed times the amount of the financial proposal of the Bid
Minimum average annual construction turnover of Birr 15,000,000.00 (Fifteen million), calculated as total certified payments received for contracts in progress and/or completed within the last 5 years, divided by 5 years, or Peak from the last 5 years..
(Ref: 37.5 (d)) - •Historical Financial Performance:
The audited balance sheets or, if not required by the laws of the Bidder’s country, other financial statements acceptable to the Employer, for the last 1 years shall be submitted and must demonstrate the current soundness of the Bidder’s financial position and indicate its prospective long-term profitability.
The audited report must be authenticated by external Auditor.
Bidders must attach legal documents of Chartered Certified Auditor and the employer may verify and cross check the Audited Financial Statement with the Income and Revenue Authority or any relevant public body.
NB. If unreliable or document discrepancy was found during due diligence, the contractor proposal will be rejected and be accountable by legal authority.
(Ref: 37.5 (b))
TechnicalQualification
- •General experience: The Bidder has successfully completed at least contracts with a budget of at least that of this contract in the past years (Ref: 37.4 (a) )
- •Specific experience: The Bidder has successfully participated as contractor or subcontractor, in at least contracts within the last years, each with a value of at least , that have been successfully and substantially completed and that are similar to the proposed Works. (Ref: 37.4 (c))
- •Equipment for the implementation of the contract: The Bidder must demonstrate that it will have available for the implementation of the contract the following equipment listed hereafter: Equipment Type and Characteristics and Minimum Number Required (Ref: 37.4 (f))
- •Pending litigation: All pending litigation shall in total not represent more than percent of the Bidder’s net worth and shall be treated as resolved against the Bidder. (Ref: 37.4 (e))
- •History of non performing contracts: Non-performance of a contract did not occur within the last years prior to the deadline for Bid submission, based on all information on fully settled disputes or litigation. A fully settled dispute or litigation is one that has been resolved in accordance with the Dispute Resolution Mechanism under the respective contract, and where all appeal instances available to the bidder have been exhausted. (Ref: 37.4 (d))
Bid Security
Amount: 200000 ETB
SME Bid Security Form: Bank/Wire Transfer, Bank_Guarantee
Foreign Bidders Form: Bank/Wire Transfer, Bank_Guarantee
Local Bidders Form: Bank/Wire Transfer, Bank_Guarantee