Tender Detail

Tender Details


Procurement of Water supply Line Construction project of Oda Bultum University Connecting Bore Hole3 to the reservoir

Oda Bultum University


Tender Information

TitleProcurement of Water supply Line Construction project of Oda Bultum University Connecting Bore Hole3 to the reservoir
DescriptionProcurement of Water supply Line Construction project of Oda Bultum University Lot 1 Connecting Bore Hole3 to the reservoir
Procuring EntityOda Bultum University
Reference NoOBU-NCB-W-0051-2018-BID-Open
Procurement MethodOpen
Submission Deadline2026-05-15 09:00:00
Invitation Date2026-03-31 10:00:00
Procurement TypeBidding
Award Typetwo envelop

Contact Information

Physical Address:chiro, Room Floor 4
chiro, Ethiopia
Contact Details:Tel: +251 920900880
Email: yenealemshume@gmail.com
Mailing Address:P.O. Box 226, Postal Code: 1000

LegalQualification

  • •conflict of interest: Bidder is found to have a conflict of interest as described in ITB Clause 6;

    (Ref: ITB 36.2(b))
  • •Signed and Sealed SBD:

    Signed and Sealed SBD must be returned with the technical document

    (Ref: rejection)
  • •valid tax clearance certificate :  Bidder has to submit a valid tax clearance certificate issued by the tax authority in accordance with ITB Clause 4.5(b)(iii).

    (Ref: 37.2(h))
  • •JV agreement:  In the case of a bid submitted by a Partnership, Consortium or a joint venture (JV), the Bidder has to submit the Form Data on Partnership, Consortium or Joint Ventures, the Agreement governing the formation of joint venture, or letter of intent to form Partnership, Consortium or Joint Venture, including a draft agreement, in accordance with ITB Clause 4.1.

    (Ref: ITB 37.2 (i))
  • •VAT registration certificate:  Bidder has to submit VAT registration certificate issued by the tax authority (in case of contract value specified in BDS Clause 4.5(b)(ii)), in accordance with ITB Clause 4. 5(b)(ii).;

    (Ref: ITB 37.2(g))
  • •valid business license : Bidder has to submit valid business license indicating the stream of business in which the Bidder is engaged, in accordance with ITB Clause 4.5(b)(i);

    (Ref: ITB 37.2)
  • •Debarment:  Bidder has not been debarred by a decision of the Public Procurement and Property Administration Authority from participating in public procurements for breach of its obligation under previous contracts, in accordance with ITB Clause 4.3;

    (Ref: ITB 37.2(e))
  • • Beneficial Ownership Disclosure Form : In case of Partnerships, Consortium or Joint Ventures, the bidder submit a separate Beneficial Ownership Disclosure Form for each member; disclose at least one of the following: -1)    Directly or indirectly holding 10% or more of the shares. 2)    Directly or indirectly holding 10% or more of the Voting Rights or3)    Directly or indirectly having the right to appoint a majority of the board of Directors or an equivalent governing body of the consultant or 4)    Whether a person directly or indirectly exercises significant influence or control over the Company (tendered)

    (Ref: ITB 37.2(k))
  • •1.8 Government Owned Entity:

    Government Owned Entity Bidder

    Certification of

    Compliance

    with

    attachments. Compliance with conditions of ITB Clause 4.4.

    (Ref: 4.4)
  • •1.9 Power of attorney:

    Power of atBidder Certification of Compliance with attachments. Bidder must attach power of attorney for the person assigned to sign the bid document with its technical document, failure to do so will result to rejection of the bidtorney

    (Ref: no)
  • •Nationality: Bidder does have nationality in accordance with ITB Clause 4.2. (Ref: ITB 37.2(a))
  • •Business organization Registration certificate: Bidder has to submit business organization registration certificate in accordance with ITB Clause 4.5(c).

    (Ref: ITB 37.2(f))

FinancialQualification

  • •Financial Resources:

    The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet the cash-flow requirement.

    (Ref: ITB 37.5 (a))
  • •Annual Turnover:

    The Peak annual turnover calculated as total certified construction work payments received for contracts in progress or completed within the past Five years.

    (Ref: ITB37.5(d))
  • •Historical Financial Performance:

    Submission of audited balance sheets and other financial statements as required in the BDS Clause 17, for the past [5] years to demonstrate the current soundness of the Bidder's financial position and its prospective long-term profitability.

    (Ref: ITB 37.5 (b))

TechnicalQualification

  • •Pending litigation:

    All pending litigation shall in total not represent more than ,,,, [10] percent of the Bidder’s net worth and shall be treated as resolved against the Bidder.

    (Ref: ITB 37.4(e))
  • •major relevant contracts successfully completed :

    Bidder has failed to provide in the Bidder Certification of Compliance Form information about major relevant contracts successfully completed 

    (Ref: ITB 37.4 (a))
  • •Bidder Certification of Compliance Form:

    Bidder has failed to provide in the Bidder Certification of Compliance Form information about contracts similar to the proposed Works in the number, value, and period 

    (Ref: ITB 37.4(c))
  • •History of non-performing contracts:

    Non-performance of a contract did not occur within the last [10] years prior to the deadline for Bid submission, based on all information on fully settled disputes or litigation. A fully settled dispute or litigation is one that has been resolved in accordance with the Dispute Resolution Mechanism under the respective contract, and where all appeal instances available to the bidder have been exhausted

    (Ref: ITB 37.4(d))
  • •General experience:

    General experience in Construction Sector as Contractor, Subcontractor and Joint Venture Minimum ----- years' experience, Bidder Certification of Compliance with attachments. For Local Contractors A minimum of 2 years General Experience in the field of Water supply line distribution bore hole pump installation and electromechanical works Construction.

     

    (Ref: ITB 37.4)
  • •Specific Experiance:

    Bidder has to submit Certificates of satisfactory execution of contracts provided by contracting parties to the contracts successfully completed in the period and budget as specified in the BDS Clause 16.3 with a budget of at least,,, that of this contract. Bidder Certification of Compliance with attachments. For Local Contractors the Bidder has successfully Participated as prime local contractor, management contractor, partner in a joint venture, or

    subcontractor; in at least ONE Water supply line distribution bore hole pump installation and electromechanical works Construction. construction contract similar in nature and complexity within the last

    10 years, with a value of at least ETB 5 million. [h1] OR The Bidder has successfully Participated as prime local contractor, management contractor, partner in a joint venture, or subcontractor; in at least Two WSP construction contract similar in nature and complexity within the last 10 years, each with a value must be equal or greater than ETB 60 million.

    N.B.

    1)     For a project done by the bidder as subcontractor/JV partner, the construction cost should be taken as the value of the sub contract or JV share.

    2)      The project must be at least 70% completed (substantial completion) within the contract scheduled time frame and to the specified quality indicating that the bidder has successfully

    or substantially completed as approved and certified by the Employer.

    3)     Approved Payment Certificates and Contract Agreement should be submitted with testimonial letter from the Employer.

    4)      The above documents are mandatory to be qualified.

    5)      Original documents may be requested by the Employer when demanded for verification

     [h1]Use 85 million ETB (Ref: ITB 37.4(b))

ProfessionalQualification

  • • professional practice certificates: Bidder has to submit relevant professional practice certificates, if required in BDS Clause 4.5(b)(iv).

    (Ref: ITB 37.3(a))
  • •information related to its professional qualification and capability: Bidder has to provide in the Bidder Certification of Compliance Form information related to its professional qualification and capability for the period specified in the BDS Clause 15.1;

    (Ref: ITB 37.3(b))
  • •CVs of the Professional staffs: Bidder has failed to provide CVs of the Professional staff signed by the staff themselves or by the authorized representative of the Professional Staff.

    (Ref: ITB 37.3)
  • •personnel for the key positions:

    Bidder has to demonstrate in its Technical Proposal that it will have the personnel for the key positions that meet requirements  1.1  Personnel for the key positions

     

    Must meet

    Technical Proposal Form

    PER 1 with attachments. Among the number of staffs mentioned in Sub-Clause 2.1 above the Bidder must demonstrate that it will have the personnel for the key positions that meet the following requirements. as tabulated here below

     

     

     

    No

     

    Position

     

    Quantity

    General experience (years)

    Specific experience (years)

    1

    Project Manager (PE IV and above BSC Degree or above in Civil Engineering or related field

    1

    12

    6

    2

    Construction Engineer PEII and above with Water Supply or Hydraulic Engineering or related fields

    1

    10

    5

    3

    Surveyor and Quantity surveyor with Diploma and above

    2

    12

    8

    4

    Safety Engineer

    1

    5

    2

    5

    Civil Engineer for Access Road construction and Maintenance of Existing roads and other utilities

    1

    8

    4

    6

    Graduate Engineer (Civil Engineering or related fields

    2

    7

    2

    7

    Construction General Forman diploma & above in construction

    1

    12

    8

    8

    Plumbing Forman diploma & above

    2

    12

    8

    9

    Office Engineer with Qualification of Hydraulic Engineering or Water related works

    1

    7

    3

    10

    Electro-Mechanical Engineer with BSC and above with relevant experience in Electrical or Mechanical Engineering

    1

    7

    5

    11

    Plumbers with technical and vocation experience

    2

    10

    8

    Note: Bidders shall submit income tax and payroll at least for the past three months.

    ü The payroll must be attached with evidence of receipt from the concerned tax Authority with clearly written full address of the tax authority with described location.

    ü Legal agreement from labor and social affairs must be attached and should be legal up on verification.[h1] 

    ü Permanent employment contract and educational testimonials should be attached in portable document format, CV signed by the professional and certified by the bidders, clearly visible credentials and professional license renewed must be attached.

    ü Original document should be submitted up on request when demanded for verifications by the public body.

    ü Specific experience is an experience in the field of water related construction projects in the proposed position.

    ü Current company/head office managers of the bidder are not eligible for any positions proposed in the project.

     

     [h1]As it is difficult to have this document to all staff and it is better if you can say to key personnel such as project manager, office engineer and construction engineer.

    (Ref: ITB 37.3 (c))
  • •Number of staff :

    Bidder Certification of Compliance.

    At least 14 staffs currently working for the Bidder. N.B. Bidders shall submit income tax and payroll for the past three months. The payroll must be attached with the receipt of concerned tax Authority.

    (Ref: sub clouse 2.1)

PerformanceQualification

  • •3.1 General experience:

    Bidder Certification of Compliance with attachments. A minimum of 2 years General Experience in the field of Water supply line distribution bore hole pump installation and electromechanical works Construction.

     

    (Ref: 1)
  • •Specific experience :

    Bidder Certification of Compliance with attachments. For Local Contractors the Bidder has successfully Participated as prime local contractor, management contractor, partner in a joint venture, or

    subcontractor; in at least ONE Water supply line distribution bore hole pump installation and electromechanical works Construction. construction contract similar in nature and complexity within the last

    10 years, with a value of at least ETB 5 million. [h1] OR The Bidder has successfully Participated as prime local contractor, management contractor, partner in a joint venture, or subcontractor; in at least Two WSP construction contract similar in nature and complexity within the last 10 years, each with a value must be equal or greater than ETB 2.5 million.

    N.B.

    1)     For a project done by the bidder as subcontractor/JV partner, the construction cost should be taken as the value of the sub contract or JV share.

    2)      The project must be at least 70% completed (substantial completion) within the contract scheduled time frame and to the specified quality indicating that the bidder has successfully

    or substantially completed as approved and certified by the Employer.

    3)     Approved Payment Certificates and Contract Agreement should be submitted with testimonial letter from the Employer.

    4)      The above documents are mandatory to be qualified.

     Original documents may be requested by the Employer when demanded for verification  [h1]Use 5 million ETB

    (Ref: 2.1)

Bid Security

Amount: 500000 ETB

SME Bid Security Form: Letter_from_Small_and_Micro_Enterprise

Local Bidders Form: Bank_Guarantee, Insurance_Letter, CPO

Terms and Conditions

1. ተቋሙ ጨረታዉን በከፊልም ሆነ ሙሉ በሙሉ የመሰረዝ መብት የተጠበቀ ነዉ፡፡
2 . ተጫራቾች የሚያቀርቡትን ዕቃ በራሳቸው ትራንስፖርት ወጭ ፤ መጫኛ ና ማዉረጃ ጨምሮ ዩኒቨርሲቲ ካምፓስ ድረስ ማቅረብ አለባቸው፡፡
3. ተጫራቾች የሚያቀርቡት እቃ በተፈለገዉ ጥራትና ደረጃ እንዲሁም በእቃው ዝርዝር መግለጫ መሰረት ይሆናል፡፡
4. ተጫራጮች ክፍያ የሚፈፀመዉ ዩኒቨርሲቲዉ ባቋቋመዉ ቴክኒክ ኮሚቴ ተረጋግጦ ዕቃዉ ገቢ ከሆነ ቡኃላ የሚፈፀም ይሆናል፡፡