Tender Detail

Tender Details

  • Company Ethiopian Roads Administration
  • Address RAS ABEBE AREGAY STREET, ADDIS ABABA, Ethiopia, Phone: +251115530423
  • Website
  • Deadline22 May 2026, 2:00 PM
  • magazineEGP
  • CountryEthiopia
  • Official noticeproduction.egp.gov.et
  • Bid Document PriceNot stated in the notice
  • Bid Security2000000
  • opening date2026-05-22 14:30:00
  • Sector Works

Hargele - Dadhame - Dolo Ado Periodic Road Maintenance Project, Lot 1

Ethiopian Roads Administration


Tender Information

TitleHargele - Dadhame - Dolo Ado Periodic Road Maintenance Project, Lot 1
DescriptionHargele - Dadhame - Dolo Ado Periodic Road Maintenance Project, Lot 1
Procuring EntityEthiopian Roads Administration
Reference NoERA-NCB-W-0088-2018-BID-Open
Procurement MethodOpen
Submission Deadline2026-05-22 14:00:00
Invitation Date2026-03-12 00:00:00
Procurement TypeBidding
Award Typetwo envelop

Contact Information

Physical Address:Ras Abebe Aregay Street, Room 5th Floor, Office the Director General
Addis Ababa, Ethiopia
Contact Details:Tel: +251 5156603
Email: engprocdir@era.gov.et
Mailing Address:P.O. Box 1770, Postal Code: 1000

FinancialQualification

  • •More on Multiple Contracts: Equipment: the sum of the equipment’s of the applied projects.Personnel: the sum of the personnel of the applied projects. (Ref: 37.5)
  • •Annual Turnover:

    The Peak annual turnover calculated as total certified construction work payments received for contracts in progress or completed within the past Five years.

      ETB 81 Million (Peak)  (Ref: ITB37.5(d))
  • •Historical Financial Performance:

    Submission of Audited Balance Sheet and Other Financial Statements as required in the Bid Data Sheet Clause 17, for the last five years or for the number of years of establishment of the firm if the firm establishment period is less than five years, to demonstrate the current soundness of the Bidder’s financial position and its prospective long-term profitability

     

    The bidder’s financial statement must fulfill at least the following minimum financial soundness requirements.

     

         i.      Average current ratio of the last five years should be more than one (1) OR

    The current ratio of the recent year should be more than one (1)

    And

       ii.     Profit before tax or return on equity of the past four years should be positive.

     

    ·      For bidders who have failed to satisfy the above financial soundness requirements, they can optionally provide and attach with the qualification document unconditional line of credit specific to the project equivalent to the amount specified under Item No. 4.3 and valid for the duration of the contract otherwise; they will be rejected from further evaluation.

    ·      If the bidder is qualified and becomes the recommended bidder for award of the contract with provision of unconditional line of credit, he shall sign tripartite agreement with ERA and the Bank before signing of the contract; otherwise, he will not be considered as successful bidder.

    ·        In case of joint venture partnership, if any of the local partner of the JV has failed to fulfill the requirement of current ratio/Average and profit before tax/Return on equity as required above, the local partner is required to bring unconditional guarantee amounting proportionally equal to the shares of the local partner calculated from the total amount of cash flow requirement Specified under item No. 4.3.

    ·        Annual financial statements shall be prepared by certified auditors but not by an accountant or accounting firms. Financial statements prepared by accounting firms will not be accepted.”

    ·      The audited financial statement prepared by an independent auditor shall be cross-verified with records maintained by the relevant tax authority or the Accounting and Auditing Board of Ethiopia.

    ·        While converting the annual turnover of other currencies to ETB, the applicable exchange rate of National Bank of Ethiopia for the date ending of each audit period shall be used.

    Note:

    ·     Current ratio is current asset divided by current liability

    ·     Return on Equity is annual profit before taxes divided by the net worth of the previous year

    Annual financial statements shall be prepared by certified auditors but not by an accountant or accounting firms. Financial statements prepared by accounting firms will not be accepted.

    (Ref: ITB 37.5 (b))
  • •Financial Resources:

    The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet the following cash-flow requirement:

     

    ETB 68 Million  (Ref: ITB 37.5 (a))

TechnicalQualification

  • •General experience:

    2 years firm experience under construction contracts in the role of Contractor, Joint Venture partner or sub-contractor.

     

    (Ref: ITB 37.4)
  • •Pending litigation:

    All pending litigation shall in total not represent more than (30%) Thirty percent  of the Bidder’s net worth and shall be treated as resolved against the Bidder.

    (Ref: ITB 37.4(e))
  • •History of non-performing contracts:

    1)  Non-performance of a contract did not occur within the last Two (2) years prior to the deadline for Qualification submission based on all information on fully settled dispute or litigation. A fully settled dispute or litigation is one that has been resolved in accordance with the Dispute Resolution Mechanism under the respective contract, and where all appeal instances available to the Bidder have exhausted. In addition to the submitted information, the respective contract, and where all appeal instances available to the Bidder have been exhausted.

    In addition to the submitted information, the Employer reserves the right to obtain any records of non-Performance of the Bidders in the past 2 years from official records within or outside of Ethiopia as a basis for qualification.

    2)  If the Employer, based on full documentary evidence, establishes poor performance by any Bidder engaged in similar works in Africa and other developing countries, on any contracts carried out over the last 2 years. Or if a bidder is not performing to the satisfaction of the Employer on the already awarded contracts, then the Employer may use this information in the assessment of the Bidders’ qualifications.

    3)  Evaluation of Contractor’s Performance shall be conducted regularly. Any Contractor’s performance shall be evaluated based on the ERA’s Contractor’s performance assessment framework and rated accordingly. The minimum acceptable performance on ongoing contracts shall be revised to reflect the actual situations. The minimum acceptable performance on ongoing contracts is set from time to time by ERA BOARD.

    4)   If ERA found Nonperformance or poor Performance history of a Bidder at any stage of the tendering process before signing of the contract agreement [except for ERA’s Monthly Contractor’s performance assessment framework, the result of which is considered only for the preceding month before submission of bid], the bidder will be rejected from the proceeding stage of the tendering.

    5) ERA will request performance of bidders on their current work performance from their respective clients (for those bidders who have no current contract Commitment with ERA) and same will be copied it to the bidders. Hence, bidders are strongly advised to facilities in order to obtain timely response from their clients within ten (10) working days of receiving of such requests. Failure to obtain such response within the stated time might result in rejection of bidders bid and the client may not take any responsibility on the matter.”

    6) Moreover, for bidders who had on-going and previous relationships with the Client, ERA would further carry out objective and qualitative assessments of the performance of the Contractor on the relevant parameters defined in the respective contracts, including compliance with quality, environmental, and other requirements, in addition to the physical progress to determine performance accomplishment to the satisfaction of the Client.

    (Ref: ITB 37.4(d))
  • •Equipment for the implementation of the contract:

    The Bidder must demonstrate that it will have available for the implementation of the contract the following equipment listed hereafter:

    (Ref: 37.4)
  • •Proposal of Work Methods and Program:

    Proposal of Work Methods and Program, in Sufficient detail to demonstrate the adequacy of the bidder’s proposal to meet the technical specifications within the completion period.

    (Ref: 37.4)
  • •Grade of Contractors:

    RC – 3 or GC – 3 or BC – 2  and above

    (Ref: 37.4)
  • •Specific Experience:

    A Minimum of any type of road Maintenance or Construction / Upgrading / Rehabilitation Project with a value of ETB 109 Million; 

    OR

    Minimum of two (2) any type of road Maintenance or Construction / Upgrading / Rehabilitation Project each with a value of ETB 54 Million

     

    In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).

     

    Domestic contractors must have completed, within the past ten years, at least one construction project similar in nature to the proposed works. The contractor must have completed at least 70% of the work in a satisfactory and acceptable manner, either as a sole contractor, joint venture member, or subcontractor. or if the contractor may not meet the relevant work experience requirement by having completed one similar project experience across three completed projects of similar nature may be submitted, provided the cumulative value is not less than one-third of the required threshold.

    In cases where relevant work experience is based on subcontracting or joint ventures, only the portion executed directly by the contractor or corresponding to its share in the joint venture shall be considered.

    The provisions of this Article shall not apply to domestic contractors classified as Grades 6 through 10.

    7. For the purposes of tender evaluation, adjustments to project values submitted by contractors as part of their work experience shall be made using the foreign exchange rate prevailing 28 days prior to the tender closing date. The adjustment shall involve dividing the contractual value at the time of agreement by the foreign exchange rate applicable at that time and then multiplying by the prevailing rate. The foreign currency exchange rate published by the National Bank of Ethiopia shall serve as the reference.

     

    . For the implementation of this Article:

    “Substantially Completed” means a project in which at least 70% (for domestic contractors)

     “Satisfactorily Completed” means a project in which at least 70% of the works have been executed by the contractor within the agreed schedule, including any approved extensions, and where a certificate of satisfactory completion, payment certificate, or other verifiable documentation from the client confirms that the required quality standards have been achieved (Ref: ITB 37.4(b))

LegalQualification

  • •Debarment:  Bidder has not been debarred by a decision of the Public Procurement and Property Administration Authority from participating in public procurements for breach of its obligation under previous contracts, in accordance with ITB Clause 4.3;

    (Ref: ITB 37.2(e))
  • •Business organization Registration certificate: Bidder has to submit business organization registration certificate in accordance with ITB Clause 4.5(c).

    (Ref: ITB 37.2(f))
  • •Debarred by decision of the FPPA:

    Not having been debarred by decision of the Public Procurement Authority from participating in public procurements for breach of its obligation under previous contracts in accordance with ITB Clause 4.3.

    (Ref: 37.2)
  • •VAT registration certificate :

    Having been submitted VAT registration certificate issued by the tax authority in accordance with ITB Clause 4.5.

    (Ref: 37.2)
  • •Valid tax clearance certificate:

    Having been submitted valid tax clearance certificate issued by the tax authority in accordance with ITB Clause 4.5.

    (Ref: 37.2)
  • •Government Owned Entity:

    Compliance with conditions of ITB Clause 4.4.

    (Ref: 37.2)
  • •Conflict of Interest:

    No conflict of interest as described in ITB Clause 6.

    (Ref: 37.2)
  • •Registration in the FPPA's Suppliers List:

    Having been registered in the Public Procurement and Property Administration Authority's Suppliers List in accordance with ITB Clause 4.6

    (Ref: 37.2)
  • •Valid trade license or business organization registration certificate:

    Having been submitted valid trade license or business organization registration certificate issued by the country of establishment in accordance with ITB Clause 4.5.

    (Ref: 37.2)
  • •Beneficial Ownership Disclosure Form:

    Unless registered on the capital Market, any Contractor (contractors) participating, whether individually or as part of a partnership, consortium, or joint venture, must fill out and submit “7. Beneficial Ownership Disclosure Form” and disclose its beneficial owners. In case of Partnerships, Consortium or Joint Ventures, the Bidder must submit a separate Beneficial Ownership Disclosure Form for each member.

    In case of Partnerships, Consortium or Joint Ventures, the bidder submit a separate Beneficial Ownership Disclosure Form for each member; disclose at least one of the following: -1)    Directly or indirectly holding 10% or more of the shares.2)    Directly or indirectly holding 10% or more of the Voting Rights or3)    Directly or indirectly having the right to appoint a majority of the board of Directors or an equivalent governing body of the consultant or4)    Whether a person directly or indirectly exercises singnificant influence or control over the company (Tenderer). (Ref: 37.2 (k))

ProfessionalQualification

  • •Number of staff:

    At least staff currently work for the Bidder

    (Ref: 37.3)
  • •personnel for the key positions:

    Bidder has to demonstrate in its Technical Proposal that it will have the personnel for the key positions that meet requirements 

    (Ref: ITB 37.3 (c))

Bid Security

Amount: 2000000 ETB

Local Bidders Form: Bank_Guarantee, CPO

Terms and Conditions

The Public Body reserves the right to accept or reject any or all bids.