CONSTRUCTION OF YENEGEWA SETOCH G+4 WORKSHOPE BUILDING
Addis Ababa Design and Construction Work Bureau
Tender Information
| Title | CONSTRUCTION OF YENEGEWA SETOCH G+4 WORKSHOPE BUILDING |
| Description | Procurement of Building Construction |
| Procuring Entity | Addis Ababa Design and Construction Work Bureau |
| Reference No | AADCWB-NCB-W-0038-2018-BID-Open |
| Procurement Method | Open |
| Submission Deadline | 2026-04-15 10:00:00 |
| Invitation Date | 2026-03-18 00:00:00 |
| Procurement Type | Bidding |
| Award Type | two envelop |
Contact Information
| Physical Address: | ANGOLA STREET (6 KILO OR AROUND IN FRONT OF EGYPT EMBASSY OR ON ADDIS ABABA EDUCATION BUREAU BUILDING), Room 7th floor Addis Ababa, Ethiopia |
| Contact Details: | Tel: +251 118959181 Email: addisababadesignandconstruction@gmail.com |
| Mailing Address: | P.O. Box 14659, Postal Code: 14659 |
LegalQualification
- •VAT registration certificate for Domestic Bidders:
Having been submitted VAT registration certificate issued by the tax authority (in case of contract value of Birr 100,000.00 and above) in accordance with ITB Clause 4. 6(b)(ii)
(Ref: 4.6(b)(ii)) - • Debarred by decision of the FPPA:
Not having been debarred by decision of the Public Procurement Agency from participating in public procurements for breach of its obligation under previous contracts in accordance with ITB Clause 4.4 and attach Bid Submission Sheet
(Ref: 4.4) - •Valid tax clearance certificate for Domestic Bidders :
Having been submitted valid tax clearance certificate issued by the tax authority (Domestic Bidders Only) in accordance with ITB Clause 4.6(b)(iii)
(Ref: 4.6(b)(iii)) - •Nationality :
Nationality in accordance with ITB Clause 4.2.
(Ref: ITB Clause 4.2) - •Conflict of Interest :
No conflict of interest as described in ITB Clause 6.
(Ref: 4.3) - •Valid business license :
Having been submitted valid trade license or business organization registration certificate issued by the country of establishment in accordance with ITB Clause 4.5(b) (i). and Relevant professional practice certificates in construction with Grade of BC-4 Or GC-5 and above accordance with ITB Sub-Clause 4.5(b) (IV) both issued by
ADDIS ABABA CITY CONSTRUCTION PERMIT AND CONTROL AUTHORITY REGISTRATION LICENSE CERTIFICATES RENEWED FOR 2018 E.C FOR NATIONAL COMPETITIVE
(Ref: 4.6(b)(i)) - •Business organization registration certificate:
Having been submitted valid business organization registration certificate issued by the country of establishment in accordance with ITB Clause 4.5 (c).
(Ref: ITB Clause 4.5 (c).)
TechnicalQualification
- • General experience:
Experience under construction industry in the role of a contractor, management contractor, partner in a joint venture, or subcontractor for at least as stated the last prior to the applications submission deadline, should have general experience record for the minimum of two year in Construction Industry;
(Ref: ITB 16) - •Specific experience:
The Bidder has successfully participated as contractor or sub-contractor and Joint Venture, in at least 10 years One Low Rise Building or Related Projects with Minimum Project cost of 150,000,000.00 ETB (one hundred fifty Million ETB) that have substantially, Successfully and satisfactorily executed to at least minimum of 70% of this competing project financial status. Or Two Low Rise Building or Related Projects with Minimum Project cost of Each 75,000,000.00 ETB (Seventy five Million ETB) that have substantially, successfully and satisfactorily executed to at least minimum of 70% of this competing project financial status. In the last 10 years (2008-2017EC).
NB.
For the purposes of tender evaluation, adjustments to project values submitted by contractors as part of their work experience shall be made using the foreign exchange rate prevailing 28 days prior to the tender closing date. The adjustment shall involve dividing the contractual value at the time of agreement by the foreign exchange rate applicable at that time and then multiplying by the prevailing rate. The foreign currency exchange rate published by the National Bank of Ethiopia shall serve as the reference.
(Ref: ITB 16) - •History of non-performing contracts:
Non-performance of a contract did not occur within the last 5 [insert required number of years] Years prior to the deadline for Bid submission, based on all information on fully settled disputes or litigation. A fully settled dispute or litigation is one that has been resolved in accordance with the Dispute Resolution Mechanism under the respective contract, and where all appeal instances available to the bidder have been exhausted.
(Ref: ITB 16) - •Pending litigation:
All pending litigation shall in total not represent more than 5% percent of the Bidder’s net worth and shall be treated as resolved against the Bidder.
(Ref: ITB 16) - •Equipment for the implementation of the contract :
The Bidder must demonstrate that it will have available for the implementation of the contract the following equipment listed hereafter:
(Ref: ITB 16)
FinancialQualification
- •Historical Financial Performance:
Submission of audited balance sheets income statements and cash flow statements and other financial statements, or if not required by the law of bidders country, the financial statements acceptable to the employer, for the last five years (2013-2017 E.C.) to demonstrate the current soundness of the bidders’ financial position and its prospective long term profitability.
Ø Liquidity ratio: (current asset / current liability) shall be greater than or equals to 1
Ø Indebts ratio = (total debt / total assets) shall be less than 1
Ø Profitability ratio: (net profit / income)*100 shall be greater than or equal to 2%
N.B
- Average of the five years will be considered for the above three ratios
- Total debt means total liability = (Current + Non-current liability)
17.1 If required in BDS, in order to proof that it has adequate financial resources to manage this Contract the bidder must present its financial data by completing relevant table in the form entitled Bidders Certification of Compliance that is furnished in Section 4, Bidding Forms.17.2 Along with the proof referred to in Clause 17.1 the documents that are required as proof of the bidder's financial standing are the following: (a) Financial statements certified by an independent auditor; (b) Other documents as stated in the BDS.
(Ref: ITB 17) - •Peak Annual Turnover:
The Bidders peak annual turnover calculated as total certified Construction work payments received for contracts in progress or completed within the last Five years (2013-2017 E.C.) must exceed should be Minimum 360,000,000.00 ETB (Three Hundred Sixty million) ETB.
NB. To account for currency fluctuations, the annual turnover figures submitted by bidders shall be adjusted using the currency exchange rate applicable 28 days prior to the tender submission deadline, based on the selling rate published by the National Bank of Ethiopia.
17.1 If required in BDS, in order to proof that it has adequate financial resources to manage this Contract the bidder must present its financial data by completing relevant table in the form entitled Bidders Certification of Compliance that is furnished in Section 4, Bidding Forms.
17.2 Along with the proof referred to in Clause 17.1 the documents that are required as proof of the bidder's financial standing are the following:
(a) Financial statements certified by an independent auditor;
(b) Other documents as stated in the BDS.
(Ref: ITB 17) - •Financial Resources:
The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet the cash-flow requirement ETB 3 million.
17.1 If required in BDS, in order to proof that it has adequate financial resources to manage this Contract the bidder must present its financial data by completing relevant table in the form entitled Bidders Certification of Compliance that is furnished in Section 4, Bidding Forms.
17.2 Along with the proof referred to in Clause 17.1 the documents that are required as proof of the bidder's financial standing are the following:
(a) Financial statements certified by an independent auditor;
(b) Other documents as stated in the BDS.
(Ref: ITB 17)
PerformanceQualification
- •Participating Micro and Small Enterprise (MSE) as a Sub-contractor:
A Proposal to participate MSE/local contractor as a sub-contractor as per the directive prepared by Addis Ababa City Administration Construction Bureau (02/2010). Article 6.5 sub article 4
a) For grade IV and less local contractor: - A minimum of 40% of total project amount of works should be proposed to sub-contract to MSE.
Documentation Required
Promising letter / Commitment letter of the bidder to give sub contracts according to as required
(Ref: directive prepared by Addis Ababa City Administration Construction Bureau (02/2010)) - •Adequacy of Technical Proposal in responding to the Schedule of Requirements:
Submit Adequacy of Technical Proposal in responding to the Schedule of Requirements
(Ref: Adequacy of Technical Proposal in responding to the Schedule of Requirements )
Bid Security
Amount: 500000 ETB
Local Bidders Form: CPO, Bank_Guarantee
Terms and Conditions
Bid Security Requirement: Deliver an original CPO in person to the Addis Ababa City Administration Design and Construction Works Bureau before the bid opening deadline.
Digital Attachment: A scanned copy of the Bid Security Guarantee must be attached to your bidding documents and uploaded via the e-GP system.
• Any bidder who fails to share their Key-Code/OTP on the system at the designated bid opening time shall be held responsible for any resulting issues; the Bureau will not accept liability.
• General and special condition of contract are governed by the term set for in attached PDF document at specific requirement
• When filling out your price quotes, please carefully review the detailed specifications and units of measurement.
• The Bureau reserves the right to cancel the bid, either fully or partially, if a better alternative is identified.