CONSTRUCTION OF KIRKOS SUB CITY POLICE COMMISSION
Addis Ababa Design and Construction Work Bureau
Tender Information
| Title | CONSTRUCTION OF KIRKOS SUB CITY POLICE COMMISSION |
| Description | Procurement of Building Construction |
| Procuring Entity | Addis Ababa Design and Construction Work Bureau |
| Reference No | AADCWB-NCB-W-0042-2018-BID-Open |
| Procurement Method | Open |
| Submission Deadline | 2026-05-25 10:00:00 |
| Invitation Date | 2026-04-18 19:00:00 |
| Procurement Type | Bidding |
| Award Type | two envelop |
Contact Information
| Physical Address: | Angola Street (6 Kilo Or Around In Front Of Egypt Embassy Or On Addis Ababa Education Bureau Building), Room 7 AA, Ethiopia |
| Contact Details: | Tel: +251 118333001 Email: addisababadesignandconstruction@gmail.com |
| Mailing Address: | P.O. Box 00000, Postal Code: 13234 |
LegalQualification
- •VAT registration certificate for Domestic Bidders:
Having been submitted VAT registration certificate issued by the tax authority (in case of contract value of Birr 100,000.00 and above) in accordance with ITB Clause 4. 6(b)(ii)
(Ref: 4.6(b)(ii)) - •Nationality :
Nationality in accordance with ITB Clause 4.2.
(Ref: ITB Clause 4.2) - •Conflict of Interest :
No conflict of interest as described in ITB Clause 6.
(Ref: 4.3) - •Valid business license :
Not having been debarred by decision of the Public Procurement Agency from participating in public procurements for breach of its obligation under previous contracts in accordance with ITB Clause 4.3.
(Ref: 4.6(b)(i)) - •Valid tax clearance certificate for Domestic Bidders :
Having been submitted valid tax clearance certificate issued by the tax authority (Domestic Bidders Only) in accordance with ITB Clause 4.6(b)(iii)
(Ref: 4.6(b)(iii)) - •Debarred by a decision of the Public Procurement and Property Authority :
Bidder has been debarred by a decision of the Public Procurement and Property Administration Agency from participating in public procurements for breach of its obligation under previous contracts, in accordance with ITB Clause 4.4.
(Ref: 4.4)
ProfessionalQualification
- •Personnel for the key positions:
Among the staff mentioned in Sub-Clause 2.1 Bidder must demonstrate that it will have the personnel for the key positions that meet the following requirements;
(Ref: 37.3 (b)) - •Number of staff:
At least 7 Professional staffs currently working for the Bidder with the Minimum professional level of PPE, PE, GE (No.2), AE, JAE and EA (No.2).
(Ref: 37.3 (a))
FinancialQualification
- • Peak Annual Turnover:
The Bidders peak annual turnover calculated as total certified Construction work payments received for contracts in progress or completed within the last Five years (2013-2017 E.C.) must exceed should be Minimum 560,000,000/ Five Hudred Sixty million
(Ref: 4.3) - •Historical Financial Performance:
Submission of audited balance sheets income statements and cash flow statements and other financial statements, or if not required by the law of bidders country, the financial statements acceptable to the employer, for the last five years (2013-2017 E.C.) to demonstrate the current soundness of the bidders’ financial position and its prospective long term profitability.
Ø Liquidity ratio: (current asset / current liability) shall be greater than or equals to 1
Ø Indebts ratio = (total debt / total assets) shall be less than 1
Ø Profitability ratio: (net profit / income)*100 shall be greater than or equal to 2%
N.B
- Average of the five years will be considered for the above three ratios
- Total debt means total liability = (Current + Non-current liability)
(Ref: ITB 17.2 ) - •Financial Resources:
The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet the cash-flow requirement ETB 3 million
(Ref: ITB)
PerformanceQualification
- •Participating Micro and Small Enterprise (MSE) as a Sub-contractor:
Participating Micro and Small Enterprise (MSE) as a Sub-contractor; (Must Meet)
A Proposal to participate MSE/local contractor as a sub-contractor as per the directive prepared by Addis Ababa City Administration Construction Bureau (02/2010). Article 6.5 sub article 4
a) For grade IV and less local contractor: - participate MSE/local contractor In terms of cost it should be a minimum of 40% of total project amount.
(Ref: 5) - • Technical Proposal in responding to the Schedule of Requirements :
Adequacy of Technical Proposal in responding to the Schedule of Requirements
(Ref: 6)
TechnicalQualification
- •Equipment :
Equipment for the implementation of the contract
(Ref: 3.1) - •Pending litigation:
All pending litigation shall in total not represent more than 5% percent of the Bidder’s net worth and shall be treated as resolved against the Bidder.
(Ref: ITB) - •3.1. General experience:
Experience under construction industry in the role of a contractor, management contractor, partner in a joint venture, or subcontractor for at least as stated the last prior to the applications submission deadline, should have general experience record for the minimum of two year in Construction Industry;
(Ref: ITB16.3) - • Specific experience:
The Bidder has successfully participated as contractor or sub-contractor and Joint Venture, in at least 10 years One B+G+4 Rise Building similar Building or Related Projects with Minimum Project cost of 350,000,000ETB ( THREE HUNDRED FIFTY Million Birr) that have substantially, Successfully and satisfactorily executed to at least minimum of 70% of this competing project financial status. Or Two B+G+2 Rise Building similar Building or Related Projects with Minimum Project cost of Each175,000,000 ETB (ONE HUNDRED SEVENTY FIVE Million birr) that have substantially, successfully and satisfactorily executed to at least minimum of 70% of this competing project financial status. In the last 10 years (2007-2018EC). NB. For the purposes of tender evaluation, adjustments to project values submitted by contractors as part of their work experience shall be made using the foreign exchange rate prevailing 28 days prior to the tender closing date. The adjustment shall involve dividing the contractual value at the time of agreement by the foreign exchange rate applicable at that time and then multiplying by the prevailing rate. The foreign currency exchange rate published by the National Bank of Ethiopia shall serve as the reference.
(Ref: 16.3)
Bid Security
Amount: 500000 ETB
Local Bidders Form: Bank_Guarantee, CPO