Tender Detail

Tender Details


Construction Works of Semera -Didigsala - Yalo (0+000 to132+000) Periodic Maintenance Road Project under Combolcha RNMBO

Ethiopian Roads Administration


Tender Information

TitleConstruction Works of Semera -Didigsala - Yalo (0+000 to132+000) Periodic Maintenance Road Project under Combolcha RNMBO
DescriptionConstruction Works of Semera -Didigsala - Yalo (0+000 to132+000) Periodic Maintenance Road Project under Combolcha RNMBO
Procuring EntityEthiopian Roads Administration
Reference NoERA-NCB-W-0086-2018-BID-Open
Procurement MethodOpen
Submission Deadline2026-05-29 15:00:00
Invitation Date2026-03-30 03:00:00
Procurement TypeBidding
Award Typetwo envelop

Contact Information

Physical Address:Ras Abebe Aregay Street, Ethiopian Roads Administration Head Office, Room Ethiopian Roads Administration , Head Office New Building, 1st Floor
Addis Ababa, Ethiopia
Contact Details:Tel: +251 15185774
Email: eraprodir@gmail.com
Mailing Address:P.O. Box 1770, Postal Code: 1165

ProfessionalQualification

  • •personnel for the key positions:

    Bidder has to demonstrate in its Technical Proposal that it will have the personnel for the key positions that meet requirements 

    Among the staff mentioned in Sub-Clause 2.1 Bidder must demonstrate that it will have the personnel for the key positions that meet the following requirements

    (Ref: ITB 37.3 (c))
  • •CVs of the Professional staffs: Bidder has failed to provide CVs of the Professional staff signed by the staff themselves or by the authorized representative of the Professional Staff.

    (Ref: ITB 37.3(d))
  • • professional practice certificates: Grade of Contractors: BC – 1, RC-1 or GC1  (Ref: ITB 37.3(a))

LegalQualification

  • •valid tax clearance certificate : Domestic Bidder has to submit a valid tax clearance certificate issued by the tax authority in accordance with ITB Clause 4.5(b)(iii). (Ref: 37.2(h))
  • •Nationality: Bidder does have nationality in accordance with ITB Clause 4.2. (Ref: ITB 37.2(a))
  • •conflict of interest: Bidder is found to have a conflict of interest as described in ITB Clause 6;

    (Ref: ITB 36.2(b))
  • •Valid trade license : Bidder has to submit valid business license indicating the stream of business in which the Bidder is engaged, in accordance with ITB Clause 4.5(b)(i);

    Having been submitted valid trade license or business organization registration certificate issued by the country of establishment in accordance with ITB Clause 4.5.

    (Ref: ITB 37.2(c))
  • •VAT registration certificate: Domestic Bidder has to submit VAT registration certificate issued by the tax authority (in case of contract value specified in BDS Clause 4.5(b)(ii)), in accordance with ITB Clause 4. 5(b)(ii).; (Ref: ITB 37.2(g))
  • •Debarred by decision of the FPPA:

    Not having been debarred by decision of the Public Procurement Authority from participating in public procurements for breach of its obligation under previous contracts in accordance with ITB Clause 4.3.

    (Ref: ITB 37.2(e))
  • •Business organization Registration certificate: Bidder has to submit business organization registration certificate in accordance with ITB Clause 4.5(c).

    (Ref: ITB 37.2(f))
  • • Beneficial Ownership Disclosure Form : In case of Partnerships, Consortium or Joint Ventures, the bidder submit a separate Beneficial Ownership Disclosure Form for each member; disclose at least one of the following: -1)    Directly or indirectly holding 10% or more of the shares.2)    Directly or indirectly holding 10% or more of the Voting Rights or3)    Directly or indirectly having the right to appoint a majority of the board of Directors or an equivalent governing body of the consultant or4)    Whether a person directly or indirectly exercises significant influence or control over the Company (tendered)

    Unless registered on the capital Market, any Contractor (contractors) participating, whether individually or as part of a partnership, consortium, or joint venture, must fill out and submit “7. Beneficial Ownership Disclosure Form” and disclose its beneficial owners. In case of Partnerships, Consortium or Joint Ventures, the Bidder must submit a separate Beneficial Ownership Disclosure Form for each member.

    (Ref: ITB 37.2(k))
  • •JV agreement:  In the case of a bid submitted by a Partnership, Consortium or a joint venture (JV), the Bidder has to submit the Form Data on Partnership, Consortium or Joint Ventures, the Agreement governing the formation of joint venture, or letter of intent to form Partnership, Consortium or Joint Venture, including a draft agreement, in accordance with ITB Clause 4.1.

    (Ref: ITB 37.2 (i))

TechnicalQualification

  • •Certificates of satisfactory execution :

    Bidder has to submit Certificates of satisfactory execution of contracts provided by contracting parties to the contracts successfully completed in the period and budget as specified in the BDS Clause 16.3 with a budget of at least that of this contract

    (Ref: ITB 37.4(b))
  • •Certification of Compliance:

    Bidder has to provide in the Bidder Certification of Compliance Form information about contracts similar to the proposed Works in the number, value, and period 

    (Ref: 37.4(c))
  • •General experience:

    Two (2) years firm experience under construction contracts in the role of Contractor, Joint Venture partner or sub-contractor.

    (Ref: ITB 37.4)
  • •Contract equipment:

    Bidder has to demonstrate in its Technical Proposal that it will have available for the implementation of the Contract equipment

    (Ref: 37.4(f))
  • •major relevant contracts successfully completed :

    Bidder has failed to provide in the Bidder Certification of Compliance Form information about major relevant contracts successfully completed 

    (Ref: ITB 37.4 (a))
  • •pending litigations :

    Bidder has to provide in the Bidder Certification of Compliance Form information about pending litigations

    All pending litigation shall in total not represent more than (30%) Thirty percent of the Bidder’s net worth and shall be treated as resolved against the Bidder.

    (Ref: 37.4(e))
  • •Proposal of Work Methods and Program:

    Proposal of Work Methods and Program, in Sufficient detail to demonstrate the adequacy of the bidder’s proposal to meet the technical specifications within the completion period.

    (Ref: ITB)
  • •Specific experience:

    A minimum of One (1) any road project with a value of at least ETB 222 Million;

    OR

    A minimum of Two (2) any road project each with a value of at least ETB 111 Million;

    In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).

    Domestic contractors must have completed, within the past ten years, at least one construction project similar in nature to the proposed works. The contractor must have completed at least 70% of the work in a satisfactory and acceptable manner, either as a sole contractor, joint venture member, or subcontractor. or if the contractor may not meet the relevant work experience requirement by having completed one similar project experience across three completed projects of similar nature may be submitted, provided the cumulative value is not less than one-third of the required threshold.

    In cases where relevant work experience is based on subcontracting or joint ventures, only the portion executed directly by the contractor or corresponding to its share in the joint venture shall be considered.

    For the implementation of this Article:

    a) “Substantially Completed” means a project in which at least 70% (for domestic contractors)

    b)  “Satisfactorily Completed” means a project in which at least 70% of the works have been executed by the contractor within the agreed schedule, including any approved extensions, and where a certificate of satisfactory completion, payment certificate, or other verifiable documentation from the client confirms that the required quality standards have been achieved.”

    (Ref: ITB 37.4)

FinancialQualification

  • •Financial standing:

    Bidder has to submit other documents proofing its financial standing, as required in the BDS Clause 17.2(b)

    (Ref: ITB 37.5 (c))
  • •Historical Financial Performance:

    Bidder has to submit financial statements certified by an independent auditor as required in ITB Clause 17.2(a) for the period

    Submission of Audited Balance Sheet and Other Financial Statements as required in the Bid Data Sheet Clause 17, for the last five years or for the number of years of establishment of the firm if the firm establishment period is less than five years, to demonstrate the current soundness of the Bidder’s financial position and its prospective long-term profitability

    The bidder’s financial statement must fulfill at least the following minimum financial soundness requirements.

    Local bidder:

    i. Average current ratio of the last five years should be more than one (1) OR

    The current ratio of the recent year should be more than one (1)

    And

    ii. Profit before tax or return on equity of the past four years should be positive.

    • For bidders who have failed to satisfy the above financial soundness requirements, they can optionally provide and attach with the qualification document unconditional line of credit specific to the project equivalent to the amount specified under Item No. 4.3 and valid for the duration of the contract otherwise; they will be rejected from further evaluation.

    • If the bidder is qualified and becomes the recommended bidder for award of the contract with provision of unconditional line of credit, he shall sign tripartite agreement with ERA and the Bank before signing of the contract; otherwise, he will not be considered as successful bidder.

    • In case of joint venture partnership, if any of the local partner of the JV has failed to fulfill the requirement of current ratio/Average and profit before tax/Return on equity as required above, the local partner is required to bring unconditional guarantee amounting proportionally equal to the shares of the local partner calculated from the total amount of cash flow requirement Specified under item No. 4.3.

    • Annual financial statements shall be prepared by certified auditors but not by an accountant or accounting firms. Financial statements prepared by accounting firms will not be accepted.”

    • The audited financial statement prepared by an independent auditor shall be notarized by verified by Accounting and Audit Board and Notarized by appropriate Notary Public and Authenticated by Foreign Affairs Minister of Ethiopia for statements prepared outside Ethiopia. 

    • While converting the annual turnover of other currencies to ETB, the applicable exchange rate of National Bank of Ethiopia for the date ending of each audit period shall be used.

    Note:

    • Current ratio is current asset divided by current liability

    • Return on Equity is annual profit before taxes divided by the net worth of the previous year

    Annual financial statements shall be prepared by certified auditors but not by an accountant or accounting firms. Financial statements prepared by accounting firms will not be accepted.

    (Ref: ITB37.5(b))
  • •Financial Resources:

    The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet the following cash-flow requirement:

    “ETB 92 Million”

    (Ref: ITB 37.5 (a))
  • •Annual Construction Turnover:

    Peak annual construction turnover of ETB 111 Million calculated as total certified payments received for contracts in progress or completed within the last Five (5) years.

    (Ref: ITB 37.5(d))

Bid Security

Amount: 2000000 ETB

Foreign Bidders Form: Bank_Guarantee

Local Bidders Form: Bank_Guarantee, Insurance_Letter

Terms and Conditions

The Ethiopian Roads Administration reserves the right to accept or reject any or all bids.
Save Tender